LANG LANG

Energy Projects & City Infrastructure


Photovoltaic park, 5MW, Thiva
Amari Amari
Project InfoP/V park, 5MW total power, in Thiva
OwnerEnerga S.A.
Design phaseFinal Design and Construction Supervision
Top

Amari waste recycling facility, Crete
Amari Amari
Project InfoConstruction of waste recycling facility and remnant disposal
OwnerCrete Prefecture
ContractorThemeli
Design phaseFinal Design
Top

Heraklion & Ag.Nikolas Water Supply from Aposelemi Dam
Aposelemi
Project InfoHeraklion - Ag. Nikolaos water supply from Aposelemi Dam - Dam Reservoir reinforcement works from Lasithi plateau
OwnerINTRAKAT
Design phaseFinal Design
NoteThe project is intended to prevent flooding of the Lasithi plateau by diverting water to the Aposelemi dam, which is then used for the nearby cities water supply and irrigation. The drainage will be done by tunneling through the mountain and installing piping from the plateau's lowest point to the reservoir below.
Top

Panorama (Voula) Wildfire Protection Network
Panorama Voulas
Project InfoFire water network protecting a 70 hectare residential area
OwnerVoula-Vari-Vouliagmeni Municipality
Design phaseFinal Design